Showing posts with label RTM Cook. Show all posts
Showing posts with label RTM Cook. Show all posts

Tuesday, 11 September 2012

'RTM Cook' at Newcastle

The Antipodean Mariner organised a 'school trip' instead of a Friday in the office, checking out 'RTM Cook' loading her second cargo - thermal or steaming coal - in Newcastle. Some of the original crew have changed, but the Chief Engineer, Second Engineer and Chief Officer from sea trials and delivery were still aboard, smiling at acquaintances remade.

Composite wide angle of RTM Cook, Kooragang Berth 7, Newcastle

Operationally she has worked well, lifting superior tonnages of iron ore and coal compared to standard Capesize vessels. Several technicians were standing on the wharf with us awaiting to board and fix small guarantee items.

View from the Compass Deck, waiting for the ship-loader
No.7 Hold, coatings looking good after 23,000 of iron ore being poured in
Three in a row...
Armed with notebooks and cameras full of things to improve on her sisters, we went down the gangway at 17:00 to fly home. 'RTM Cook' sailed in the early hours of Sunday morning with 152,595 tonnes of steaming coal for Map Ta Phut. Sea trials for PN67/'RTM Dampier' this week in Subic, though the AM is sitting out this dance. Next after 'RTM Dampier' is PN68/'RTM Zheng He' in November.

AM

Monday, 23 January 2012

RTM Cook launched

PN65, now ready for launch as ‘RTM Cook’, has had her second taste of the sea and has moved to the fitting out dock. The launch was delayed by a few days due to last-minute work to one of the other vessels in the dry dock. PN66 moved to the front of the dock and the keels for PN67 and PN68 were laid.

'RTM Cook' with fenders rigged and ready for float out

'RTM Cook' with PN66 ready for float forward


Flooding the dock


Yard and Owner's Representatives witnessing the safe launch

‘RTM Cook’ is about four months away from sea trials and work will now focus on commissioning the systems installed during the dock construction. Launchings are no longer the grand affairs of ships sliding down greased slipways with flags streaming and whistles blaring. A little less than two years have elapsed from first visit to the Yard to launching of the first ship.

The Antipodean Mariner